Our deploy took eleven minutes. Not eleven minutes of work — eleven minutes of waiting, with a progress log that told you nothing and could not be hurried. It should have been infuriating. It became the most reliable thinking window of my week.
The shape of the gap
Eleven minutes is a strange length. Too long to stare at, too short to start anything. You cannot open a real task and you cannot usefully refresh the log. The only things that fit are walking to the window, making coffee, or thinking about what you just wrote.
Because it was enforced rather than chosen, it happened whether or not I wanted it to. I have never once successfully scheduled eleven minutes of reflection. I had it imposed on me four times a day for two years.
I have never scheduled a thinking break and kept it. The build scheduled one for me and I could not opt out, which is the only reason it worked.
What showed up in the gap
Mostly small corrections. The deploy was the last point at which I had the whole change in my head, and standing there with nothing to do, I kept noticing things — an edge case, a name that was wrong, an assumption I had not tested.
- A real share of the bugs I caught that year were caught while waiting for the thing containing them to ship.
- It was the only moment in the loop where I was finished but not yet moved on.
- The thinking was never deliberate. It was what my head did when there was nothing else available.
Then we made it fast
Forty seconds, eventually, and it was unambiguously the right call — eleven minutes is an absurd tax on a team. But the gap went with it, and nothing replaced it. There is no longer a moment where I am done and idle at the same time.
I am not arguing for slow builds. I am arguing that the loop had a feature nobody designed, nobody noticed, and nobody costed when we removed it, and I suspect most tooling changes are like this.
Responses
Members can reply, and replies thread. Disagreement is welcome; the only rule is that it is about the argument.